Smolenskaya GRES connected consumers to heating system

Smolenskaya GRES Branch of Unipro PJSC has completed connection of consumers in the settlement of Ozerny to the heating system. According to the schedule approved by the order of the Ozerny Urban Settlement Administration, heating was first supplied to social facilities. 

Smolenskaya GRES provides hot water and heating to 188 facilities. In order to ensure timely connection to the heating system, the power engineers had the heat networks repaired on a regular basis.

The repair program included the works for metal insulation of the main pipelines at the section from Smolenskaya GRES to Ozerny Settlement (2.5 km), overhaul of above-ground pipelines in Dovatora, Entuziastov and Sadovaya streets (1.2 km), replacement of the pipeline thermal insulation between chambers 21 and 22 (0.22 km).

The total length of the main and district heat networks located in the power plant area of responsibility makes over 34 km.