Company news

Prev. Next
31.03.15 Victor Tolokonsky, Governor of the Krasnoyarsk Krai, Visited Berezovskaya GRES

The visit was part of the Krasnoyarsk Krai Governor’s business trip to Sharypovsky District. During his visit to E.ON Russia Berezovskaya GRES, Victor Tolokonsky visited the museum and production facilities of the power plant, as well as the site of the third power unit where installation of the equipment has been already completed and the pre-commissioning works are well under way. The commissioning of the new power unit is planned for this summer.

Read more
23.03.15 E.ON Russia Publishes the RAS Reporting for 2014

E.ON Russia publishes the accounting statements prepared according to the Russian Accounting Standards (RAS) for 2014.

Read more
17.03.15 E.ON Russia Publishes IFRS Financial Results for 2014

E.ON Russia discloses the audited consolidated financial statements prepared according to the International Financial Reporting Standards (IFRS) for 2014.

Read more
16.03.15 E.ON Russia to Perform Scheduled Repairs of the CCGT at Surgutskaya GRES-2

Starting from March 30 to April 19, 2015 E.ON Russia will carry out planned repair works and maintenance of the main and auxiliary equipment of the combined cycle gas turbine plant (CCGT) at Surgutskaya GRES-2. CCGT Units № № 7, 8 with the capacity of 800 MW will be stopped. The schedule of the repair campaign is agreed with the System Operator of the Unified Energy System.

Read more
12.03.15 E.ON Russia 2014 Full Year Results Conference Call

On March 17, 2015 at 6 PM MSK a conference call for analysts and investors on the E.ON Russia’s full year results 2014 will be held.

Read more
23.01.15 In 2014, E.ON Russia’s Power Stations Generated 59.2 Bln Kilowatt Hours

In 2014, electric power generation of E.ON Russia totaled 59.2 bln kWh, showing a 6 % decrease as compared to the analogous period of 2013. Electric power sales volume in 2014 totaled 62.0 bln kWh (-5 % as compared to the last year).

Read more
13.01.15 Surgutskaya GRES-2 is repairing its facilities

On January 4, 2015, at E.ON Russia Surgutskaya GRES-2 fire outbreak and oil slobbering occurred in the turbine room near STU No. 4 which was under unscheduled current repair of turbo feed pumps.

Read more
02.12.14 E.ON SE New Strategy

E.ON focuses on renewables, distribution networks, and customer solutions.

Read more
27.11.14 E.ON Russia Receives Confirmation of ISO 14001:2004 Conformity Certificate

E.ON Russia succeeded in passing the first inspection (compliance audit) for verifying the Certificate of Conformity of the company’s environmental management system with ISO 14001:2004 requirements in the cogeneration area. The inspection was conducted by a group of independent auditors of the Russian Register Certification Association, accredited by international certification authorities – members of the International Accreditation Forum (IAF).

Read more
19.11.14 E.ON Russia received the certificate of operational readiness for the autumn-winter period 2014-2015

On November 14, 2014 E.ON Russia has received the certificate of operational readiness for the autumn-winter period 2014-2015.

Read more
Berezovskaya GRES
Smolenskaya GRES
Surgutskaya GRES
Shaturskaya GRES
Moscow representative office
Yaivinskaya GRES
Engineering
Unipro Engineering