Perfomance Indicators

Basic production and technical characteristics of Unipro, 2016
Power plant Commissioning years
(connection to the grid)
Installed capacity,
MW
ICUF* 2016 , % Electric power generation 2016, mln kWh
Unipro   11,205.1 55.4 54,530
Surgutskaya GRES-2 1985-2011 5,657.1 72.0 35,746
Berezovskaya GRES 1987-2015 2,400.0 33.6 7,057
Shaturskaya GRES 1971-2010 1,493.4 40.4 5,306
Smolenskaya GRES 1978-1985 630.0 28.1 1,557
Yaivinskaya GRES 1963-2011 1,024.6 53.9 4,864