Company news

Prev.
1 2 3 4 5 6 7
Next
10.11.16 Unipro publishes unaudited financial results in accordance with IFRS

Unipro Group has published unaudited financial results for January–September of 2016 in accordance with the International Financial Reporting Standards.

Read more
03.11.16 Meeting of the Board of Directors of Unipro was held

On 02nd November 2016, the Meeting of the Board of Directors of Unipro PJSC was held and it was decided to convene an Absentee Extraordinary General Meeting of Shareholders of the company.

Read more
02.11.16 Unipro PJSC receives certificate of operational readiness for 2016-2017 winter season

On 02 November 2016, Unipro received the Certificate of Operational Readiness for 2016-2017 winter season.

Read more
27.10.16 Berezovskaya GRES receives operational readiness certificate for the coming winter season

The commission set up to assess Berezovskaya GRES branch of Unipro PJSC operational readiness for the 2016-2017 winter season of maximum loads completed its work.

Read more
27.10.16 Smolenskaya GRES receives operational readiness certificate for 2016-2017 winter season maximum loads

Smolenskaya GRES has received operational readiness certificate for the 2016-2017 autumn-winter season.

Read more
26.10.16 Surgutskaya GRES-2 was handed a certificate of readiness for operation in the winter season

According to the results of the commission, which included representatives of the North-Ural Rostekhnadzor Department, MOE-Yugra Khanty-Mansiysk District, a branch of OAO "UES" Tyumen RDU and PJSC "Yunipro" October 13, the station was handed a passport ready for winter.

Read more
24.10.16 Yaivinskaya GRES received a certificate of readiness for operation in the winter season of 2016–2017

Yaivinskaya GRES Branch of Unipro PJSC received a certificate of readiness for operation in the winter season of 2016–2017.

Read more
21.10.16 Shaturskaya GRES received a certificate of operational readiness for the autumn-winter period 2016–2017

Shaturskaya GRES Branch of Unipro PJSC is ready for operation in the autumn-winter season of 2016–2017. The inspection of the power plant was performed by a designated commission, including representatives of the Ministry of Energy, Rostekhnadzor, EMERCOM of Russia, System Operator, and Moscow representative office of Unipro PJSC.

Read more
21.10.16 Unipro Publishes the RAS Accounting Statements for 9 Months of 2016

Unipro PJSC publishes the accounting statements for nine months of 2016, prepared according to the Russian Accounting Standards (RAS).

Read more
20.10.16 Unipro increased power generation by 3.3% in January–September 2016

Over the 9 months of 2016, the power plants of Unipro PJSC have generated 39.9 bln kWh, which is 3.3% more compared to the same period of 2015.

Read more
Berezovskaya GRES
Smolenskaya GRES
Surgutskaya GRES
Shaturskaya GRES
Yaivinskaya GRES
Engineering
Unipro Engineering