Company news

Prev.
3 4 5 6 7 8 9
Next
28.02.17 Smolenskaya GRES Has Started Maintenance Works of Power Unit No. 2

The maintenance campaign for 2017 has started at Smolenskaya GRES Branch of Unipro PJSC.

Read more
24.01.17 In 2016, PCSJ Unipro Power Stations of Generated 54.5 bln kWh

In 2016, the power plants of PJSC Unipro generated 54.5 bln kWh, which is 1.4 % more compared to the same period of 2015. Over the reference period the electricity sales have totalled 58.2 bln kWh (+2.7 % compared to the previous year).

Read more
24.01.17 Shaturskaya GRES Has Increased Electric Power Generation by 8.3%

In 2016, electric power generation at Shaturskaya GRES Branch of Unipro PJSC amounted to 5,306 mln kWh, which is 8.3% higher than for the same period of 2015 (4,899 million kWh).

Read more
16.12.16 Unipro has succeeded in passing recertification of the environmental management system

Unipro has obtained the Certificate of Compliance of the Company’s Environmental Management System (EMS) to the requirements of the new version of ISO 14001:2015 international standard in respect of electric and heat power generation, heat power transportation.

Read more
09.12.16 Unipro PJSC Held Extraordinary General Meeting of Shareholders

Unipro PJSC held an extraordinary general meeting of its shareholders in absentia on December 8, 2016.

Read more
10.11.16 Unipro publishes unaudited financial results in accordance with IFRS

Unipro Group has published unaudited financial results for January–September of 2016 in accordance with the International Financial Reporting Standards.

Read more
03.11.16 Meeting of the Board of Directors of Unipro was held

On 02nd November 2016, the Meeting of the Board of Directors of Unipro PJSC was held and it was decided to convene an Absentee Extraordinary General Meeting of Shareholders of the company.

Read more
02.11.16 Unipro PJSC receives certificate of operational readiness for 2016-2017 winter season

On 02 November 2016, Unipro received the Certificate of Operational Readiness for 2016-2017 winter season.

Read more
27.10.16 Berezovskaya GRES receives operational readiness certificate for the coming winter season

The commission set up to assess Berezovskaya GRES branch of Unipro PJSC operational readiness for the 2016-2017 winter season of maximum loads completed its work.

Read more
27.10.16 Smolenskaya GRES receives operational readiness certificate for 2016-2017 winter season maximum loads

Smolenskaya GRES has received operational readiness certificate for the 2016-2017 autumn-winter season.

Read more
Berezovskaya GRES
Smolenskaya GRES
Surgutskaya GRES
Shaturskaya GRES
Moscow representative office
Yaivinskaya GRES
Engineering
Unipro Engineering