Company news

Prev.
5 6 7 8 9 10 11
Next
02.02.16 Power Unit No. 3 of Berezovskaya GRES is Under Unscheduled Repairs

Presumably, the accident with subsequent fire ignition in the boiler room of Power Unit No. 3 of Berezovskaya GRES was caused by the fuel oil pipeline loss of sealing.

Read more
01.02.16 Separation of E.ON business operations completed on January 1.

E.ON now to focus on renewables, energy networks, and customer solutions. Uniper to ensure supply security with conventional generation and energy trading

Read more
27.01.16 E.ON Russia Smolenskaya GRES generated over 1.9 billion kWh of electric power in 2015

E.ON Russia Smolenskaya GRES generated over 1.9 billion kWh of electric power in 2015.

Read more
25.01.16 In 2015, E.ON Russia Power Stations Generated 53.8 bln kWh

Over 2015, the electric power generation by E.ON Russia totalled 53.8 bln kWh, showing a 9.2% decrease compared to the 2014. Electric power sales volume in 2015 totalled 56.7 bln kWh, showing a 8.6 % decrease compared to the 2014 figures.

Read more
12.01.16 Certification Testing of Shaturskaya GRES CCGT-400 Power Unit Was Successfully Completed for the Standardized Primary Frequency Control (SPFC)

E.ON Russia Shaturskaya GRES acquired the certificate of compliance with Standard STO 59012820.27.100.004-2012 “Norms of Participation of Combined Cycle Gas Turbines in the Standardized Primary Frequency Control and Automatic Secondary Frequency and Active Power Transfer Control.”

Read more
16.12.15 Unit 1 of Berezovskaya GRES is the only coal steam power unit participating in SPFC

Unit 1 of Berezovskaya GRES is currently the first and the only coal steam power generation unit participating in SPFC.

Read more
01.12.15 E.ON Russia holds a commissioning ceremony for the third 800 MW generating unit of Berezovskaya GRES

The international concern E.ON SE and its subsidiary E.ON Russia held a commissioning ceremony for 800 MW power unit No. 3 at E.ON Russia Berezovskaya GRES.

Read more
12.11.15 E.ON Russia Publishes the Indicators According to the IFRS for 9 Months of 2015

E.ON Russia publishes the unaudited 9 months 2015 financial results prepared in accordance with International financial reporting standards.

Read more
28.10.15 E.ON Russia publishes RAS Accounting Statements for 9 months of 2015

E.ON Russia publishes accounting statements prepared according to the Russian Accounting Standards (RAS) for the nine months of 2015.

Read more
20.10.15 E.ON Connecting Energies LLC, a subsidiary of E.ON Russia, and Yantarenergo sign an energy service contract for installation of smart meters
Read more
Berezovskaya GRES
Smolenskaya GRES
Surgutskaya GRES
Shaturskaya GRES
Moscow representative office
Yaivinskaya GRES
Engineering
Unipro Engineering