27.10.22 | Unipro Publishes the RAS Accounting Statements for 9 Months of 2022 |
Unipro PJSC publishes its accounting statements for nine months of 2022 prepared in accordance with the Russian Accounting Standards (RAS). |
|
Read more | |
26.10.22 | Smolensk Power Engineers Completed the 2022 Repair Campaign |
Unipro PJSC’s Smolenskaya GRES branch took down its 210 MW power unit No. 3 for repairs. |
|
Read more | |
26.10.22 | For 9M 2022, Unipro PJSC’s Power Plants Increased Electric Power Generation by 21.8% |
In January–September 2022, Unipro PJSC power plants generated 39.7 bn kWh of electric power, having increased this indicator by 21.8% year-on-year. |
|
Read more | |
25.10.22 | Yaivinskaya GRES Opened a New Exhibition |
The exhibition is situated on one of the floors of the administrative building and is accessible to anyone interested at any time. It demonstrates replications of impressionist painters from the collection of the Morozov brothers. |
|
Read more | |
14.10.22 | AK&M Rating Agency assigned Unipro PJSC an ESG reporting rating at the RESG 2 level |
AK&M Rating Agency assigned Unipro PJSC an ESG reporting rating at the RESG 2 level, which corresponds to the high level of disclosure of information about sustainable development in the organization's public reports. |
|
Read more | |
14.10.22 | Active Work on Import Substitution at Power Unit No. 5 of Yaivinskaya GRES |
The replacement of the thermal control equipment of the gas turbine unit of the combined cycle gas turbine plant (CCGT) has been successfully elaborated, which allows for saving more than RUB 500 thousand a year. |
|
Read more | |
10.10.22 | Power Engineers of Shaturskaya GRES Held the Campaign “Light Up” |
As part of the project “Uniproshka for Children”, power engineers of Shaturskaya GRES Branch of Unipro PJSC, together with the Traffic Police, held the preventive campaign “Light Up”. |
|
Read more | |
07.10.22 | Several Unipro Projects at Once Among the Best Projects of the ConTEKst Contest |
The results of the leading national award ConTEKst-2022 were summed up, which identified the best communication projects of companies in the fuel and energy complex and industry. |
|
Read more | |
06.10.22 | To Practice Actions |
As part of the work of the winterisation commission, an emergency (combined with fire-fighting) drill was held at Shaturskaya GRES Branch of Unipro PJSC. |
|
Read more | |
04.10.22 | Cultural Education to the Masses |
At Shatura, with the support of Unipro PJSC, the second stage of the Golden Mask Festival was held. |
|
Read more |